Birsfelden power plant, mechanical renovation of dyke
Scope of services / technical features
Our contract included the following maintenance work of sluice gate no. 4:
Check of the bottom plate concreted in and renovation of the bottom gasket, maintenance of the top and bottom gate with the replacement of gaskets, the roller car from the top and bottom gates, all guide rollers and springs as well as the niche add-ons (tracks, guide rails, seal running surface, edge protection). Replacement of wearing parts, screws, seals, pins, terminals as well as the disassembly and re-assembly of the chains provided by the customer and pinion axes of the upper support.
Key specifications
Length 27.00 metres, height 9.40 metres, weight: lower support 146 to., upper support 80 to
Brief description
Renovation of weir no. Birsfelden 4 flow water power plant
The steel and mechanical engineering maintenance work was performed on site and at the MAG plant.